We deliver photovoltaic power plants for building roofs, ground-mount installations and agri-PV. We work with proven components and manage the whole process with our own team — from the site survey to operational monitoring.
What we provide
How a project runs
Free site survey
We assess the roof structure, orientation and shading. We measure consumption and propose the optimal capacity.
Quote and contract
We present a transparent calculation including subsidies and financing. Once approved, we sign a works contract.
Project documentation
We prepare the implementation project and arrange all the necessary approvals from the distribution company.
Installation and connection
Installation usually takes 2–5 days depending on size. Our team handles the installation, wiring and inspection.
Handover and service
After grid connection and monitoring setup we hand over the work with documentation. We provide a warranty and post-warranty service.
Certificates and qualifications
Frequently asked questions
At current electricity prices and with appropriate sizing, payback in Slovakia is most often 6–9 years. We prepare a specific calculation after the site survey.